Works Contracts for the Rehabilitation, Upgrade and Extension of Water and Sewerage Networks in Chingola, Chililabombwe and Mufulira)
The scope of works in this contract include the following:
1. Construction of new and replacement bulk water sewerage networks in Chingola, Chililabombwe and Mufulira;
2. Construction of. new reservoirs
3. Construction of new pumping stations
Lot 1 Chingola
Chingola
1. Construction of 32.7 km of new and replacement bulk water mains in Chingola;
2. Construction of 2 no. new reservoirs at Kabundi;
3. Construction of a new pumping station at Kabundi;
4. Construction of a new pumping station at Kasompe;
5. Upgrade of existing K2, Kasompe 1, Kasompe 2, Roberts, A2 Reservoirs and E1 Elevated Tank, including the provision of new valve chambers and interconnecting pipework;
6. Replacement of 33.7 km of reticulation pipelines in Lulamba, Nchanga South / Town Centre and Riverside / Soweto;
7. Construction of 36.5 km of new water reticulation network in Chingola South;
8. Construction of 41.1 km of new sewer network and outfalls in Chingola South.
Lot 2 Chililabombwe
Chililabombwe
1. Construction of 17.6 km of new and replacement bulk water mains in Chililabombwe;
2. Construction of new reservoir and small pumping station at Hilltop;
3. Upgrade of existing Hillside and Konkola Reservoirs, including the provision of new valve chambers and interconnecting pipework;
4. Replacement of 11.6 km of reticulation pipelines in Mine Township;
5. Construction of 38.7 km of new water reticulation network in Kamenza East Medium and High Cost areas.
Lot 3 Mufulira
Mufulira
1. Construction of 24.2 km of new and replacement bulk water mains in
Mufulira;
2. Construction of a new reservoir at Fairview;
3. Construction of a new pumping station at Kamuchanga;
4. Rehabilitation of an existing pumping station at Fairview;
5. Upgrade of existing Fairview 1, Fairview 2, Kamuchanga 1 and
Kamuchanga 2 Reservoirs and Fairview and Kamuchanga Elevated Tanks, including the provision of new valve chambers and interconnecting pipework;
6. Replacement of 15.6 km of reticulation pipelines in Butondo.
ZWS2/C1XD/W/002/L1 Refurbishment and Upgrade of Water and Wastewater Networks in Chingola
ZWS2/C1XD/W/002/L2 Refurbishment and Upgrade of Water and Wastewater Network in Chililabombwe
ZWS2/C1XD/W/002/L3 Refurbishment and Upgrade of Water and Wastewater Network in Mufulira