Detailed Design and Construction Supervision Services for the Refurbishment and Upgrade of Water and Wastewater Network in Chingola, Chililabombwe and Mufulira
The DCSC will be engaged to perform as ‘the Engineer’ as defined by FIDIC forms of contract, for the above contract. The DCSC will design and administer the construction contracts for all the packages presented below and ensure that the works are constructed in accordance with the provisions stated in the conditions of contract, drawings, specifications and bills of quantities. In parallel with these activities the DCSC shall support the MWSC’s PIU in their work to ensure smooth project implementation. All works shall be carried out in full compliance with the Zambian requirements.
The overall duration of the service contract shall be 54 months including the defects liability period of the network works contracts. The details provided in the table are indicative and are based on the outcome of a feasibility study conducted on the water and sewerage network.
Chingola Water Treatment Plant, Chililabombwe Treatment Plant, Mufulira Water Treatment Plants and some selected Sewer Ponds.
Design and construction supervision Chililabombwe: this contract will include the following:
• 21 km of bulk water pipeline that require new installation and or upgrades;
• 33 km of reticulation extensions into unserviced areas;
• 20 km of water networks rehabilitation in existing areas;
• 33 km of bulk sewer network upgrades;
• 1 Pump station;
• 3 Reservoirs;
Design and Construction Supervision Chingola:
This contract will include the following:
• 29 km of bulk water pipeline that require new installation and or upgrades;
• 54 km of reticulation extensions into unserviced areas;
• 42 km of water networks rehabilitation in existing areas;
• 54 km of sewer network upgrades;
• 3 Pump stations;
• 11 Reservoirs.
Design and Construction Supervision Mufulira:
• 17 km of bulk water pipeline that require new installation and or upgrades;
• 5 km of reticulation extensions into unserviced areas;
• 18 km of water networks rehabilitation in existing areas;
• 5 km of sewerage network upgrades;
• 2 Pump stations;
• 8 Reservoir.
The contract is funded by the European Investment Bank (EIB), Agence Francaise de Developpement (AFD) and the Government of the Republic of Zambia (GRZ).